/ Project Highlight /

Your location:Home / Project Highlight / Earth Retaining or Stabilising Structure Project / Ningbo Rail Transit Command Center RETURN
Ningbo Rail Transit Command Center
The basic project of Ningbo Rail Transit Command Center, engineering piles, enclosing piles, etc., uses high-pressure rotary jet piles, two-axis and three-axis cement mixing piles, with a pile diameter of 800-1000mm and a pile length of 25m, 54m, and 65m. There are 1,109 .