/ Project Highlight /

Your location:Home / Project Highlight / Earth Retaining or Stabilising Structure Project / Foundation pit project of Xiaowen Lane, Haishu District, Ningbo RETURN
Foundation pit project of Xiaowen Lane, Haishu District, Ningbo
The total construction area of the project is about 33,700 square meters. The enclosing piles are bored cast-in-situ piles. The secondary enclosing of the pit in the pit is a high-pressure rotary jet grouting pile. Blasting pile combined. Bored cast-in-situ piles (353 including column piles) have a pile diameter of Φ600-Φ950 and a pile length of 19.0m-36.5m; cement mixing piles (4803.43m3) have a pile diameter of Φ700 @ 500 and a pile length of 2.5m-16m; The pile diameter (3644.92m3), the secondary enclosing high pressure rotary jet grouting pile in the pit is 700mm in diameter, and the pile length is 2m-16m.