/ Project Highlight /

Your location:Home / Project Highlight / Industrial Foundation Project / CNPC Jiangsu LNG Project Receiving Station RETURN
CNPC Jiangsu LNG Project Receiving Station
Jiangsu LNG Project Receiving Station: It is located on the Xitaisha artificial island in Yangkou Port District, Nantong City, Jiangsu Province. The receiving station project is mainly composed of process systems, auxiliary production systems and public engineering systems, including 3 storage volumes of 160,000 m3 and China's first 20 10,000 m3 LNG full-containment storage tank. The base of the storage area is a three-way bidirectional extruded reinforced concrete bored pile. It is a high-cap pile, with a diameter of 1.4 m and a length of 60 m. The pile body is provided with three bearing plates. 2.4m, the total number of piles is 360, and all the pile ends are grouted. During the construction of the project, Zhejiang Yitong pioneered and overcome difficulties in many aspects such as management and technology, actively explored and practiced, and achieved a series of results, winning the "National Quality Engineering Award".