The total length of the 7-span cross-rail bridge pile foundation project of the Dhaka-Kurna N8 Road in Bangla-desh is about 55km. Our corporation has built a cross-rail railway bridge and viaduct pile foundation project, with 884 bored piles with a diameter of 1.2m and a pile length of 43m-46m.